| Preliminary scheme
- Study of the specifications
- Technical recommendations and commercial offer
Design
- Preliminary study: delivery of the simplified functional analysis, equipment dimensioning, preliminary layout, structure of the automation for validation.
- Detailed study: delivery of the manufacturing drawings, nomenclature, materials data sheet, and detailed functional analysis for validation.
- Design in accordance with the cGMP and CFR guidelines
Manufacturing and FAT
- Scheduling and production scheme in compliance with the "Quality Plan Project"
- Manufacturing & Assembling
- Finalization of the documentary file
- Delivery of the FAT protocols
- Complete FAT in our technical plant before shipment
Commissioning, tests and validation on site
- Installation on site
- Preliminary tests
- SAT
- Assistance to the IQ and OQ qualifications
- Training
Maintenance
- Data processing telemaintenance trough modem
- Preventive maintenance contract on site
Curative maintenance intervention (in France and abroad upon request) |